New value (for specific property): once object matches Find Value, the Batch Change will aply New Value to it.
New Value is non-case sensitive too except when working with Text Content of Text, Mtext, Dimension and Table.
New value can be:
Note:
For example: New value = "ARCH-" = "AAA-"; "CONC" = "C" will rename "ARCH-FURN" layer to "AAA-FURN", and "TAG-CONC" layer to "TAG-C"
Example of formulas in Change spreadsheet
Normally 1 object has many properties. Each property has its own Find Value and New Value (except ReadOnly property, like IsDynamicBlock, will have no New Value). To access full properties form of a object, use "Change" spreadsheet. Other spreadsheets are design for a specific property or specific group of properties only.
When working "Change" spreadsheet, the issue is to how determine object is matched those Find Values. Cause Find Value results can be varies, you can choose combination type at Combination box.There are 2 options:
Each running session, a backup folder is created. All your drawings will be copied to subfolders in that backup folder.
To find your old drawing, click "Log" command. Log worksheet will be activate. Select the your working session in cell B2. All backed up drawings will be listed. Find your drawing there and click to link at Backup Location column.
You can also have your custom description of each running session via this Log spreadsheet.
By default, JTB Batch Change BackUp folder is located in Windows's Temp folder. You can change this setting in Help worksheet
Note: You should manually empty your BackUp folder to save disk space. A warning will bring up if there is not enough disk space.
Visit our webpage for more information: http://jtbworld.com/jtb-batch-change-for-autocad
For support email us at info@jtbworld.com